Eyup - Rami - Yesilpinar Cable Car
Eyup – Rami – Yesilpinar cable car project was tendered by Istanbul Metropolitan Municipality. Within the scope of the project, Prota’s services included; track-way alignment engineering, preparation of route alternatives, selection of the most appropriate route based on surveying studies, determining the location of stations, preliminary design of stations, preparation of operational scenarios and development plan along with financial and economic feasibility studies. In 2023, it is estimated that the line will carry 15.200 passengers daily.