Samsun Tekkekoy Combined Cycle Power Plant

Samsun Tekkekoy CCPP 1

The capacity of Samsun Combined Cycle Power Plant is 600 MW

Samsun Tekkekoy 2

The scope of Prota includes structural design, and preparation off all reports, calculations, drawings and specifications for the new CCPP plant

Constructed by Cengiz Energy, the power plant is in Samsun, Turkey.  Having 240 MW power of capacity, the plant was opened in 2009.

Within the scope of the project, Prota’s services include;

  • Reinforced Concrete and Steel Design 
  • Quantity Takeoff and Cost Analysis

Details

  • LocationSamsun, Turkey
  • ClientCengiz Energy
  • Capacity240 MW
  • Term of Contract2009