Light Rail System Between F.Altay and Narlıdere Districts
Tendered by Izmir Metropolitan Municipality, Fahrettin Altay – Narlidere light rail system is 7.2 km long and includes 7 stations. In 2023, it is estimated that the line will carry 290.000 passengers daily.
Within the scope of the project, Prota’s services include;
- Track-way Alignment Engineering and Railway Design
- Architectural and Finishing Works Design
- Structural, Geotechnical and Tunnel Design
- Electrical and Electromechanical System Design
- Mechanical Engineering Design
- Fire Safety Engineering and Control System Design
- Acoustic and Vibration Design
- Traffic Plan and Landscape Design
- Preparation of Cost Estimates, Bills of Quantities and Tender Documents