Balcova Bus Terminal
In this project, different structure systems were designed such as coffered and ribbed slabs and precast girder floor systems depending upon the functions of the buildings.
Prota's scope of work covered;
- design of reinforced concrete bridges and tunnels.
- design of special steel conveyors for the palm-shaped roof elements, which were located in the central courtyard of the building.
- reinforced concrete structure system design for the span area which is up to 25 feet.
All the construction works were finished in 2001 and since then, the facility is under operation.