Ankara High Speed Train Station

Ankara high speed train terminal, constructed by Cengiz – Limak – Kolin Joint Venture, was designed by Prota. The terminal was designed to serve 20.000 passengers daily in its first year and 50.000 passengers in the near future. The terminal contains a hotel with 102 rooms, an office area covering 6.200 sq. meters and a shopping area covering 24.500 sq. meters.  In the terminal, there are six railway lines and three passenger platforms each at 400 meters long and 11 meters wide.

Covering more than 175.000 sq. meters, the terminal is the first high-speed train terminal of Turkey. Within the scope of the project, Prota’s services include;

  • Project Coordination Among Different Disciplines
  • Project Management Consultancy Services
  • Structural Design of the Terminal

Details

  • LocationAnkara, Turkey
  • ClientCengiz-Limak-Kolin Joint Venture
  • Total Closed Area175.000 m²
  • Term of Contract2014 - 2016