Prota Designed Ankara High Speed Train Terminal Is Under Construction
Prota designed Ankara High Speed Train Terminal is being built by Cengiz – Limak – Kolin joint venture and will be completed by mid 2016.
Approximately 175.000 m² of the total construction area, 32.000 m² is facility. Terminal will provide 20.000 passenger capacity daily at the first stage, and 50.000 passenger capacity daily in near future.
6 new tracks and 3 new passenger platforms are being built for the arrival and the departure of high-speed trains.