Driving Test of Mecidiyekoy - Mahmutbey Metro Line Project Was Carried Out

Driving test of Istanbul’s second driverless metro line project, Mecidiyekoy – Mahmutbey metro was carried out by Istanbul Mayor Mevlut Uysal.

Planned to be in service in the fourth quarter of 2019, the metro project was delivered by Prota’s structural, civil, geotechnical, wind and fire engineering teams.

Total length of the Mahmutbey-Mecidiyeköy line is 18 kilometers long and has 15 stops. The project is also the first metro project in Turkey designed on a BIM platform using 5D design technology.